Difference between revisions of "Phase 1"

From RFF Wiki
Jump to: navigation, search
(Workshops)
 
(16 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
== Architecture Team ==
 
== Architecture Team ==
  
Aus UIC_RFF_Architecture_Document.pdf
+
The following persons were part of the architecture team
 +
 
 +
{| class="wikitable"
 +
! '''Name'''
 +
! '''Company'''
 +
! '''Email'''
 +
|-
 +
| Mahesh Bhatter
 +
| DB Cargo
 +
| mahesh.bhatter@deutschebahn.com
 +
|-
 +
| Cecilia Dagerholm
 +
| xRail
 +
| cecilia.dagerholm@xrail.eu
 +
|-
 +
| Erik Evtimov
 +
| Citrail
 +
| erik.evtimov@cit-rail.org
 +
|-
 +
| Vanessa Langhammer
 +
| RCA
 +
| vanessa.langhammer@railcargo.com
 +
|-
 +
| Markus Lund
 +
| xrail
 +
| markus.lund@xrail.eu
 +
|-
 +
| John Lutz
 +
| UIC (RPC)
 +
| john.lutz@orange.fr
 +
|-
 +
| Lori Paquet
 +
| CFL
 +
| lori.paquet@cfl-mm.lu
 +
|-
 +
| Stefan Schaefer
 +
| UIC (interconnective)
 +
| sfr@interconnective.at
 +
|-
 +
| Dani Schwander
 +
| UIC (interconnective)
 +
| dsc@interconnective.at
 +
|-
 +
| Christian Strauss
 +
| DB Cargo
 +
| christian.c.strauss@deutschebahn.com
 +
|-
 +
| Tom Thijs
 +
| Lineas
 +
| tom.thijs@lineas.net
 +
|-
 +
| Michel Thüring
 +
| SBB Cargo
 +
| michel.thuering@sbbcargo.com
 +
|-
 +
| Wassilios Tsolakidis
 +
| UIC (Oaktree)
 +
| wtsolakidis@oaktree-partners.com
 +
|-
 +
| Mark Verhulst
 +
| Lineas /RailData
 +
| mark.verhulst@lineas.net
 +
|-
 +
| Petr Červinka 
 +
| CD CARGO
 +
| petr.cervinka@cdcargo.cz
 +
|-
 +
| Thomas Heydenreich
 +
| GCU
 +
| mail@th-heydenreich.de
 +
|-
 +
| Josef Stahl
 +
| RNE
 +
| josef.stahl@ren.eu
 +
|-
 +
| Hannes Luts
 +
| Xrail
 +
| hannes.lutz@xrail.eu
 +
|-
 +
| Conor Feighan
 +
| Erfa Rail
 +
| conor.feighan@erfarail.eu
 +
|-
 +
| Mike Gürntke
 +
| Xrail
 +
| mike.guerntke@xrail.eu
 +
|-
 +
| Helge Stuhr
 +
| Xrail
 +
| helge.stuhr@xrail.eu
 +
|-
 +
| Bertrand Minary
 +
| SNCF Fret
 +
| bertrand.minary@sncf.fr
 +
|-
 +
| Michel van Dijk
 +
| Xrail
 +
| michel.vandijk@xrail.eu
 +
|-
 +
| Marc Valette
 +
| CFL
 +
| marc.valette@cfl-mm.lu
 +
|-
 +
| Christian Kühnast
 +
| DB
 +
| christian.kuehnast@deutschebahn.com
 +
|}
  
 
== RoadMap ==
 
== RoadMap ==
  
Aus UIC_RFF_Architecture_Document.pdf
+
In order to define the architecture of the future RU platform, the following Roadmap was worked out.
 +
 
 +
[[File:Roadmap_Phase1.png|border|Roadmap]]
 +
 
 +
In the following document, you will find results to all aspects covered by the blue architecture team.
 +
 
 +
Based on the [[Vision|Vision]] and [[Values#Basic Principles|Basic Principles]] defined by the CIOs and based on the [[Architecture#Limitations|Limitations]] of todays systems (defined in the [[Architecture#Current Architecture|Current Architecture]]), Target [[Architecture#Capabilities|Capabilities]] were worked out. Gaps between existing limitations and future capabilities were identified and process requirements were worked out.
 +
 
 +
Based on these results the necessary [[Architecture#Data Objects|data objects]] and their visibility was worked out.
 +
 
 +
The [[Architecture#Target Architecture|target architecture]] is based on the choosen data objects and capabilities and defines a basic framework with basic services, a future RU platform has to provide.
 +
 
 +
Based on the choosen Basic Principles a [[Architecture#Migration Path|migration path]] was worked out for the first iteration phase.
 +
 
 +
Results from Vision, Governance and Value Proposition were always considered and incorporated into the analysis of the architecture team.
  
 
== Iterations ==
 
== Iterations ==
Line 23: Line 143:
 
* [[Phase1 Iteration5|Iteration 5 (June 25 - July 8 2020)]]
 
* [[Phase1 Iteration5|Iteration 5 (June 25 - July 8 2020)]]
 
* [[Phase1 Iteration6|Iteration 6 (July 9 - August 19 2020)]]
 
* [[Phase1 Iteration6|Iteration 6 (July 9 - August 19 2020)]]
* [[Phase1 Iteration7|Iteration 7(August 20 - September 2 2020)]]
+
* [[Phase1 Iteration7|Iteration 7 (August 20 - September 2 2020)]]
 
* [[Phase1 Iteration8|Iteration 8 (September 3 - September 16 2020)]]
 
* [[Phase1 Iteration8|Iteration 8 (September 3 - September 16 2020)]]
 
* [[Phase1 Iteration9|Iteration 9 (September 17 - October 14 2020)]]
 
* [[Phase1 Iteration9|Iteration 9 (September 17 - October 14 2020)]]
Line 31: Line 151:
 
* [[Phase1 Iteration13|Document Approval (December 10)]]
 
* [[Phase1 Iteration13|Document Approval (December 10)]]
  
[[Pandoc]]
+
== Workshops ==
 +
 
 +
* [[Phase1 Workshop1|Capabilities - Location and Train Identification (June 16 2020)]]
 +
* [[Phase1 Workshop2|Capabilities - Train Operations and Wagon Status (June 18 2020)]]
 +
* [[Phase1 Workshop3|Capabilities - Wagon Damage, Rolling Stock (June 22 2020)]]
 +
* [[Phase1 Workshop4|Capabilities - Train Preparation and Braking Rules (June 24 2020)]]
 +
* [[Phase1 Workshop5|Capabilities - Shipment Booking and Ordering (June 26 2020)]]
 +
* [[Phase1 Workshop6|Capabilities - Train Service Planning and Intermodal Traffic (June 29 2020)]]
 +
* [[Phase1 Workshop7|Capabilities - Non-Functional Requirements (June 30 2020)]]
 +
* [[Phase1 Workshop8|Capabilities - Rolling Stock (July 7 2020)]]
 +
* [[Phase1 Workshop9|Data Objects - Consignment Note, TrainPreparation, Wagon Status (August 24 2020)]]
 +
* [[Phase1 Workshop10|Data Objects - Path Management, Train Run (August 27 2020)]]
 +
* [[Phase1 Workshop11|Data Objects - Wagon Related Messages (August 28 2020)]]
 +
* [[Phase1 Workshop12|Data Objects - Single Wagon Load, Shipment, Booking, Operations (August 31 2020)]]
 +
* [[Phase1 Workshop13|Architecture - Platform Framework Concepts (September 10 2020)]]
 +
* [[Phase1 Workshop14|Architecture - Platform Framework  Deep Dive (September 11 2020)]]
 +
* [[Phase1 Workshop15|Architecture - Architecture Meeting (September 17 2020)]]
 +
* [[Phase1 Workshop16|Small Player Integration (October 14 2020)]]
 +
* [[Phase1 Workshop17|Migration Path Scenarios (October 22 2020)]]
 +
* [[Phase1 Workshop18|Document Approval (December 12 2020)]]

Latest revision as of 18:47, 15 February 2021

under construction
this page is still under construction

Architecture Team

The following persons were part of the architecture team

Name Company Email
Mahesh Bhatter DB Cargo mahesh.bhatter@deutschebahn.com
Cecilia Dagerholm xRail cecilia.dagerholm@xrail.eu
Erik Evtimov Citrail erik.evtimov@cit-rail.org
Vanessa Langhammer RCA vanessa.langhammer@railcargo.com
Markus Lund xrail markus.lund@xrail.eu
John Lutz UIC (RPC) john.lutz@orange.fr
Lori Paquet CFL lori.paquet@cfl-mm.lu
Stefan Schaefer UIC (interconnective) sfr@interconnective.at
Dani Schwander UIC (interconnective) dsc@interconnective.at
Christian Strauss DB Cargo christian.c.strauss@deutschebahn.com
Tom Thijs Lineas tom.thijs@lineas.net
Michel Thüring SBB Cargo michel.thuering@sbbcargo.com
Wassilios Tsolakidis UIC (Oaktree) wtsolakidis@oaktree-partners.com
Mark Verhulst Lineas /RailData mark.verhulst@lineas.net
Petr Červinka  CD CARGO petr.cervinka@cdcargo.cz
Thomas Heydenreich GCU mail@th-heydenreich.de
Josef Stahl RNE josef.stahl@ren.eu
Hannes Luts Xrail hannes.lutz@xrail.eu
Conor Feighan Erfa Rail conor.feighan@erfarail.eu
Mike Gürntke Xrail mike.guerntke@xrail.eu
Helge Stuhr Xrail helge.stuhr@xrail.eu
Bertrand Minary SNCF Fret bertrand.minary@sncf.fr
Michel van Dijk Xrail michel.vandijk@xrail.eu
Marc Valette CFL marc.valette@cfl-mm.lu
Christian Kühnast DB christian.kuehnast@deutschebahn.com

RoadMap

In order to define the architecture of the future RU platform, the following Roadmap was worked out.

Roadmap

In the following document, you will find results to all aspects covered by the blue architecture team.

Based on the Vision and Basic Principles defined by the CIOs and based on the Limitations of todays systems (defined in the Current Architecture), Target Capabilities were worked out. Gaps between existing limitations and future capabilities were identified and process requirements were worked out.

Based on these results the necessary data objects and their visibility was worked out.

The target architecture is based on the choosen data objects and capabilities and defines a basic framework with basic services, a future RU platform has to provide.

Based on the choosen Basic Principles a migration path was worked out for the first iteration phase.

Results from Vision, Governance and Value Proposition were always considered and incorporated into the analysis of the architecture team.

Iterations

aus UIC_RFF_Meeting_Minutes.pdf

Workshops