Phase1 Workshop18

From RFF Wiki
Revision as of 09:05, 12 February 2021 by Dsc (talk | contribs) (Created page with "== 20-12-10 Documentation Approval == === Participants === * Stefan Schäfer * John Lutz * Mahesh Batter, DB Cargo * Cecilia Dagerholm, Xrail * Frank Kschonzak, Captrain DE...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

20-12-10 Documentation Approval

Participants

  • Stefan Schäfer
  • John Lutz
  • Mahesh Batter, DB Cargo
  • Cecilia Dagerholm, Xrail
  • Frank Kschonzak, Captrain DE
  • Markus Lund, Xrail
  • Dani Schwander

Minutes

  • It was noted that in the future, comments should be added directly to the slide sets.
  • Participation and engagement should be improved for the next phase - expand the architectural group and get new participants. Work with Xrail to get better collaboration within the community.
  • The documentation as is has been approved with the amendments that were discussed. 
  • Next Steps:. 
    • Migrate to the new file store. Xrail will try to have that is already open. UIC will also create a teams site.
    • Oaktree will be shutting down the teams site so that it can be migrated over to the new fileshare site. 
    • The model will be made part of the documentation, independent of Oaktree Teams site. The Master model will be the Enterprise Architect file which is a part of the documentation zip file.
  • Phase II (Xrail presentation)
    • Xrail willl take over the PMO activity for architecture in conjunction with Raildata. A core team will be established (TBA)
    • Continue to work on the bottom up capabilities
    • Align RU community
    • Identify key smart services
    • Align with ecosystem (RNE, DTLF, etc.)
    • Core group planning willl be done by 20 January (see slides for timeline)

Decisions/Actions

  • Upload documents to the teams site for download (zip file, file from Wassilios and the readme doc.)
  • Ask Sandra about the funding and parallel initiative documentation that can go into the central repository. 
  • Documentation has now been approved. Needs to be moved to the new repository and put into the right structure. 
  • Talk to Sandra about aligning the filestore, so that there is only one repository for the on-going work.