Phase2 Iteration1
From RFF Wiki
The Phase2 works in iterations.
Contents
Iteration 1
The first iteration lasts from 21.January to 11.February.
Topics
- Capabilities
- C14 Monitor WSM data quality
- C34 Monitor WPM data quality
- C19 Train operation for small RU
- C77 Consignment note for small RU
- Plan iterations 2 to 4
- Prepare ticket system
Results
C14 Monitor WSM
In this iteration we worked out four steps to monitor the WSM data quality and coverage.
- Identified WSM KPIs
- Defined measurement points
- Prioritized KPIs
- Roadmap KPIs
The first step focus on identification of the KPIs to be measured.
list in Excel (formula) (target level) Roadmap in Powerpoint Maintenance process in Powerpoint
C34 Monitor WPM
- list in Excel WPM KPIs
An overview can be seen below.
- (formula)
- (target level)
- Targeted Routing for WPM messages
C19 Train Operation
Roadmap in Powerpoint next task in Powerpoint
C77 Consignment Note in WDI
Slideset of Josef Stahl Open questions: coverage, role and license