Phase2 Iteration1

From RFF Wiki
Revision as of 23:22, 3 February 2021 by Sfr (talk | contribs) (Created page with "The Phase2 works again in iterations. == Iteration 1 == The first iteration lasts from 21.January to 11.February. === Topics === # Capabilities ## C14 Monitor WSM data quali...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

The Phase2 works again in iterations.


Iteration 1

The first iteration lasts from 21.January to 11.February.

Topics

  1. Capabilities
    1. C14 Monitor WSM data quality
    2. C34 Monitor WPM data quality
    3. C19 Traon operation for small RU
    4. C77 Consignment note for small RU
  2. Plan iterations 2 to 4
  3. Prepare ticket system

Results