Phase2 Iteration11

From RFF Wiki
Revision as of 16:35, 16 September 2021 by Sfr (talk | contribs) (Created page with "The Phase 2 works in iterations. See setup of the Architecture stream. == Iteration 11 == The eleventh iteration lasts from 23.September to 4.November. === Topics === ====...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

The Phase 2 works in iterations. See setup of the Architecture stream.

Iteration 11

The eleventh iteration lasts from 23.September to 4.November.

Topics

Capabilities

C01: Managed CRD Location Masterdata

The target of this task is to enhance the CRD master data to a level where it can be used as new GEO master data reference. We will continue this task by

  • collect the experience and gaps with the CRD data quality so far
  • sketch a analysis method to determine the actual state of the master data
  • evaluate whether a data quality assurance is needed (CRD KPI)
  • defining the maintenance process
  • Bilateral location quality meetings will be planned to discuss the national specialties and the maintenance process.
  • Beside that we will continue on the GEO model – location link.

User Validation

  1. Discovery sessions

The second SOLution Discovery session is planned for 4.November.

POC DigitalPlatform

POC MARS MVP


Reviews


Results