Phase2 Iteration6

From RFF Wiki
Revision as of 10:52, 30 April 2021 by Sfr (talk | contribs) (Created page with "The Phase 2 works in iterations. See setup of the Architecture stream. == Iteration 6 == The six iteration lasts from 6.May to 27.May. === Topics === ==== Capabilities ====...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

The Phase 2 works in iterations. See setup of the Architecture stream.

Iteration 6

The six iteration lasts from 6.May to 27.May.

Topics

Capabilities

There are two new topics to handle:

C43: Office Integration of RSDS requests

The task foresees to lower the hurdles for A type RUs to access RollingStock datasets. This should be achieved by utilizing Office technology.

C14: Define report tool for RFF

The target is to define the centrally operated reporting tool for the RFF digital platform.

And two existing to continue:

C01: Managed CRD Location Masterdata

The target of this task is to enhance the CRD masterdata to a level where it can be used as new GEO masterdata reference. We will start this task in this iteration by

  • collect the experience and gaps with the CRD data quality so far
  • sketch a analysis method to determine the actual state of the master data
  • evaluate whether a data quality assurance is needed (CRD KPI)
  • defining the maintenance process

We know that this task will accompany us for several iterations.

SM: SmartService Profile

Based on the Smart Services list we continue to describe the Smart Services. With these profiles we can then start the discussion with the CIO/steering committee on prioritization.


Reviews

Smart Service profiles


Results