Phase2 Iteration1

From RFF Wiki
Revision as of 13:45, 4 February 2021 by Sfr (talk | contribs) (C34 Monitor WPM)
Jump to: navigation, search

The Phase2 works in iterations.


Iteration 1

The first iteration lasts from 21.January to 11.February.

Topics

  1. Capabilities
    1. C14 Monitor WSM data quality
    2. C34 Monitor WPM data quality
    3. C19 Train operation for small RU
    4. C77 Consignment note for small RU
  2. Plan iterations 2 to 4
  3. Prepare ticket system

Results

C14 Monitor WSM

In this iteration we worked out four steps to monitor the WSM data quality and coverage.

  • Identified WSM KPIs
  • Defined measurement points
  • Prioritized KPIs
  • Roadmap KPIs

The first step focus on identification of the KPIs to be measured.

list in Excel (formula) (target level) Roadmap in Powerpoint Maintenance process in Powerpoint

C34 Monitor WPM

An overview can be seen below. WPM KPI 210204.png

  • (formula)
  • (target level)
  • Targeted Routing for WPM messages

Wagon Performance message routing.png

C19 Train Operation

Roadmap in Powerpoint next task in Powerpoint

C77 Consignment Note in WDI

Slideset of Josef Stahl Open questions: coverage, role and license