Phase2 Iteration4
The Phase 2 works in iterations. See setup of the Architecture stream.
Contents
Iteration 4
The fourth iteration lasts from 25.March to 15.April.
Topics
Capabilities
The top most ranked capabilities from the shopping list are treated in this fourth iteration. Also tasks created during the work in the previous iterations are continued in this iteration.
A&B RU's requirements
We plan one or two introduction sessions for the interested type A&B RU partners. Additionally the first Discovery Session will take place in this iteration. So at the end of this iteration we can give a first insight of the new workshop format: Discovery Session
SM: SmartService Profile
Based on the Smart Services we will describe
- what the smart service is about
- what is the aim
- which needs does it cover and
- what is the potential benefit of it.
We have begun to create the first profiles and will continue in this iteration.
C01: Managed CRD Location Masterdata
The target of this task is to enhance the CRD masterdata to a level where it can be used as new GEO masterdata reference. We will start this task in this iteration by
- collect the experience and gaps with the CRD data quality so far
- sketch a analysis method to determine the actual state of the master data
- evaluate whether a data quality assurance is needed (CRD KPI)
- defining the maintenance process
We know that this task will accompany us for several iterations.
C34: WPM KPI Web Monitor
This task forsees to visualize the defined WPM KPI to support the WPM data quality maintenance. Each partner can access directly its dashboard to get an overview if and where its WPM data quality is below the expected level.
Reviews
Smart Service profiles
- SM_01 Optimize Asset Utilization
- SM_13 Share Free Capacity
- SM_21 GPC Triggered TRI
- SM_22 WDI Enhancement for Last Mile
- SM_23 TelematicData of Wagon
Results
A&B RU's requirements
We have planned to conduct an introduction sessions for the interested type A&B RU partners. and the first Discovery Session in this iteration.
- We have created 4 sessions with four seats available each.
- We have sent out 30 invitations to RUs.
In ten days we got one reservation. The interest is too low to start the sessions. Therefor we reschedule the sessions. The topic will be discussed in the SteerCo and then we relaunch this task. Discovery Session
SM: SmartService Profile
Based on the Smart Services list we have described the following Smart Services.
- SM_08 Siding Everywhere
- SM_17 Facilities on location
- SM_24 Authority Communication
We will continue to describe the next Smart Services. With these profiles we can then start the discussion with the CIO/steering committee on prioritization.
==== C43: WPM KPI Web Monitor ====