Difference between revisions of "Phase3 Iteration7"
From RFF Wiki
Line 23: | Line 23: | ||
In the meantime the SteerCo has validated the proposed RFF organisation setup. | In the meantime the SteerCo has validated the proposed RFF organisation setup. | ||
+ | |||
+ | = Planning 2022 = | ||
+ | * June/July: | ||
+ | ** Business Workshops | ||
+ | ** Workpackage leader introduction | ||
+ | * August: | ||
+ | ** Technical Workshops | ||
+ | ** Workpackage leader introduction | ||
+ | * September: | ||
+ | ** Finalization of Dossiers | ||
+ | * After September: | ||
+ | ** KickOff of the Workpackages |
Revision as of 13:26, 21 June 2022
Iteration 21.6
The iteration lasts from 21.June to 12.July.
Topics
- MARS status and demo
- WP workshops status
- WP leader introductions
- Planning 2022
DP Rail topics
In DP Rail the following topics are treated:
- Digital Train Operations Initial Workshop on 8.June √
- Digital Train Handover Initial Workshop on 9.June √
- Digital Consignment Note Initial Workshop on 5.July [planned]
- Digital Train Composition Initial Workshop on 30.June [planned]
- Telematic Data Sharing Initial Workshop on 13.June √
- Train Service Harmonization Initial Workshop on 14.June √
- Train ETA Service Initial Workshop on 27.June [planned]
The DP Rail organisation is laid out here: File:DP-RAIL-Contribution RFF IT Fullteam Folien 0-19.pdf
In the meantime the SteerCo has validated the proposed RFF organisation setup.
Planning 2022
- June/July:
- Business Workshops
- Workpackage leader introduction
- August:
- Technical Workshops
- Workpackage leader introduction
- September:
- Finalization of Dossiers
- After September:
- KickOff of the Workpackages