Difference between revisions of "Phase2 Iteration8"

From RFF Wiki
Jump to: navigation, search
Line 56: Line 56:
 
=== Results ===
 
=== Results ===
  
User validation, lead by Tibo Noël
+
==== Smart Services description ====
 +
SM_06 [[End-To-End Transport Planning]]
 +
SM_07 [[Capacity Optimization]]
 +
SM_09 [[Low Entry Barrier for Transport Offerings]]
 +
SM_11 [[Automated Shunting]]
 +
SM_12 [[Intermodal Alignment]]
 +
SM_15 [[Intermodal Connectivity Package]]
 +
SM_25 [[Port Terminal Communication]]
 +
 
 +
==== User validation ====
 +
lead by Tibo Noël
 
Summarizes two important tasks
 
Summarizes two important tasks
 
# RFF member validation and cooperation
 
# RFF member validation and cooperation
 
# A&B type Discovery sessions
 
# A&B type Discovery sessions
  
==== RFF Member validation and cooperation ====
+
===== RFF Member validation and cooperation =====
 
Tibo plans with each partner a workshop to validate its interests and cooperation abilities
 
Tibo plans with each partner a workshop to validate its interests and cooperation abilities
  
==== A&B type Discovery sessions ====
+
===== A&B type Discovery sessions =====
 
Goal: Identify needs of non-RFF members, non platform users (focus in first step on A&B type RU’s)
 
Goal: Identify needs of non-RFF members, non platform users (focus in first step on A&B type RU’s)
 
Topics: Learn about the needs of “Small RU’s” and sketch possible services to cover them
 
Topics: Learn about the needs of “Small RU’s” and sketch possible services to cover them

Revision as of 15:14, 2 July 2021

The Phase 2 works in iterations. See setup of the Architecture stream.

Iteration 8

The eight iteration lasts from 17.June to 8.July.

Topics

Capabilities

C01: Managed CRD Location Masterdata

The target of this task is to enhance the CRD master data to a level where it can be used as new GEO master data reference. We will continue this task by

  • collect the experience and gaps with the CRD data quality so far
  • sketch a analysis method to determine the actual state of the master data
  • evaluate whether a data quality assurance is needed (CRD KPI)
  • defining the maintenance process

User Validation

The User validation stream consists of three different topics:

  1. RFF member validation
  2. Discovery sessions
  3. Ecosystem alignment
RFF member validation

In the RFF member validation each member can lay out

  • his preferences for realization of the RFF topics and
  • his contribution in this selection

With this voting the Peer groups and sponsors are identified to support the chosen services to build up.

DISCO: Discovery Session

We will in this iteration

  • to conduct the first Gap Discovery session (in German) and
  • to support and follow up with the contact persons of the RFF partners.

Ecosystem alignment

In the next step we will tackled the integration of the RFF DP ecosystem in the existing context.

SM: SmartService Profile Review

The last descriptions of the 26 SamrtServices are completed and can be reviewed. With these profiles we can then start the discussion with the CIO/steering committee on prioritization and validation.


Reviews

Reporting Tool

Smart Service profiles


Results

Smart Services description

SM_06 End-To-End Transport Planning SM_07 Capacity Optimization SM_09 Low Entry Barrier for Transport Offerings SM_11 Automated Shunting SM_12 Intermodal Alignment SM_15 Intermodal Connectivity Package SM_25 Port Terminal Communication

User validation

lead by Tibo Noël Summarizes two important tasks

  1. RFF member validation and cooperation
  2. A&B type Discovery sessions
RFF Member validation and cooperation

Tibo plans with each partner a workshop to validate its interests and cooperation abilities

A&B type Discovery sessions

Goal: Identify needs of non-RFF members, non platform users (focus in first step on A&B type RU’s) Topics: Learn about the needs of “Small RU’s” and sketch possible services to cover them First session (in German language) held Tuesday 6.July with

  • SBB Cargo International (RU)
  • BLS Cargo (RU)
  • WLE (RU)
  • CN Consult (Railway IT supplier)