Line 42: Line 42:
 
----
 
----
 
=== Results ===
 
=== Results ===
 +
 +
===== C43: Office Integration of RSDS requests =====
 +
The task foresees to lower the hurdles for A type RUs to access RollingStock datasets.
 +
This should be achieved by utilizing Office technology.
 +
 +
===== C14: Define report tool for RFF =====
 +
We settled the basis to define the centrally operated reporting tool for the RFF digital platform.
 +
[[Reporting Tool]]
 +
 +
===== C01: Managed CRD Location Masterdata =====
 +
 +
The target of this task is to enhance the CRD masterdata to a level where it can be used as new GEO masterdata reference. We will start this task in this iteration by
 +
* collect the experience and gaps with the CRD data quality so far
 +
* sketch a analysis method to determine the actual state of the master data
 +
* evaluate whether a data quality assurance is needed (CRD KPI)
 +
* defining the maintenance process
 +
 +
The findings can be found at [[Master Data]].

Revision as of 13:02, 30 April 2021

The Phase 2 works in iterations. See setup of the Architecture stream.

Iteration 5

The fifth iteration lasts from 15.April to 6.May.

Topics

Capabilities

There are two new topics to handle:

C43: Office Integration of RSDS requests

The task foresees to lower the hurdles for A type RUs to access RollingStock datasets. This should be achieved by utilizing Office technology.

C14: Define report tool for RFF

The target is to define the centrally operated reporting tool for the RFF digital platform.

And two existing to continue:

C01: Managed CRD Location Masterdata

The target of this task is to enhance the CRD masterdata to a level where it can be used as new GEO masterdata reference. We will start this task in this iteration by

  • collect the experience and gaps with the CRD data quality so far
  • sketch a analysis method to determine the actual state of the master data
  • evaluate whether a data quality assurance is needed (CRD KPI)
  • defining the maintenance process

We know that this task will accompany us for several iterations.

SM: SmartService Profile

Based on the Smart Services list we continue to describe the Smart Services. With these profiles we can then start the discussion with the CIO/steering committee on prioritization.


Reviews

Smart Service profiles


Results

C43: Office Integration of RSDS requests

The task foresees to lower the hurdles for A type RUs to access RollingStock datasets. This should be achieved by utilizing Office technology.

C14: Define report tool for RFF

We settled the basis to define the centrally operated reporting tool for the RFF digital platform. Reporting Tool

C01: Managed CRD Location Masterdata

The target of this task is to enhance the CRD masterdata to a level where it can be used as new GEO masterdata reference. We will start this task in this iteration by

  • collect the experience and gaps with the CRD data quality so far
  • sketch a analysis method to determine the actual state of the master data
  • evaluate whether a data quality assurance is needed (CRD KPI)
  • defining the maintenance process

The findings can be found at Master Data.