Difference between revisions of "Phase2 Iteration1"

From RFF Wiki
Jump to: navigation, search
m (Results)
Line 21: Line 21:
  
 
The first step focus on identification of the KPIs to be measured.
 
The first step focus on identification of the KPIs to be measured.
 +
 +
list in Excel
 +
(formula)
 +
(target level)
 +
Roadmap in Powerpoint
 +
Maintenance process in Powerpoint
  
 
==== C34 Monitor WPM ====
 
==== C34 Monitor WPM ====
 +
list in Excel [https://teams.microsoft.com/l/file/2C3AB67B-9E93-4433-9320-4FFB9C9CF031?tenantId=ef588fbf-8705-4200-a1a6-3be9fc3bb45b&fileType=xls&objectUrl=https%3A%2F%2Fxrail.sharepoint.com%2Fsites%2FRFFDigitalplatforms%2FShared%20Documents%2FEU%20data%20platforms%2FPhase%202%2FCore%20group%20meetings%2F210128_CoreTeam%2F210128_WPM_KPIs_V1.xls&baseUrl=https%3A%2F%2Fxrail.sharepoint.com%2Fsites%2FRFFDigitalplatforms&serviceName=teams&threadId=19:2ae0c3a808134862b280a79d6edb3cc4@thread.tacv2&groupId=e8f92e7a-8d91-4214-9fe7-28b21e040c7f WPM KPIs]
 +
(formula)
 +
(target level)
 +
Route as picture and Powerpoint
 +
 
==== C19 Train Operation ====
 
==== C19 Train Operation ====
 +
Roadmap in Powerpoint
 +
next task in Powerpoint
 +
 
==== C77 Consignment Note in WDI ====
 
==== C77 Consignment Note in WDI ====
 +
Slideset of Josef Stahl
 +
Open questions: coverage, role and license

Revision as of 13:34, 4 February 2021

The Phase2 works in iterations.


Iteration 1

The first iteration lasts from 21.January to 11.February.

Topics

  1. Capabilities
    1. C14 Monitor WSM data quality
    2. C34 Monitor WPM data quality
    3. C19 Train operation for small RU
    4. C77 Consignment note for small RU
  2. Plan iterations 2 to 4
  3. Prepare ticket system

Results

C14 Monitor WSM

In this iteration we worked out four steps to monitor the WSM data quality and coverage.

  • Identified WSM KPIs
  • Defined measurement points
  • Prioritized KPIs
  • Roadmap KPIs

The first step focus on identification of the KPIs to be measured.

list in Excel (formula) (target level) Roadmap in Powerpoint Maintenance process in Powerpoint

C34 Monitor WPM

list in Excel WPM KPIs (formula) (target level) Route as picture and Powerpoint

C19 Train Operation

Roadmap in Powerpoint next task in Powerpoint

C77 Consignment Note in WDI

Slideset of Josef Stahl Open questions: coverage, role and license