Difference between revisions of "Phase2 Iteration1"

From RFF Wiki
Jump to: navigation, search
Line 8: Line 8:
 
## C14 Monitor WSM data quality
 
## C14 Monitor WSM data quality
 
## C34 Monitor WPM data quality
 
## C34 Monitor WPM data quality
## C19 Traon operation for small RU
+
## C19 Train operation for small RU
 
## C77 Consignment note for small RU
 
## C77 Consignment note for small RU
 
# Plan iterations 2 to 4
 
# Plan iterations 2 to 4
 
# Prepare ticket system
 
# Prepare ticket system
 
=== Results ===
 
=== Results ===
 +
==== C14 Monitor WSM ====
 +
In this iteration we worked out four steps to monitor the WSM data quality and coverage.
 +
* Identified WSM KPIs
 +
* Defined measurement points
 +
* Prioritized KPIs
 +
* Roadmap KPIs
 +
 +
The first step focus on identification of the KPIs to be measured.
 +
 +
==== C34 Monitor WPM ====
 +
==== C19 Train Operation ====
 +
==== C77 Consignment Note in WDI ====

Revision as of 08:54, 4 February 2021

The Phase2 works in iterations.


Iteration 1

The first iteration lasts from 21.January to 11.February.

Topics

  1. Capabilities
    1. C14 Monitor WSM data quality
    2. C34 Monitor WPM data quality
    3. C19 Train operation for small RU
    4. C77 Consignment note for small RU
  2. Plan iterations 2 to 4
  3. Prepare ticket system

Results

C14 Monitor WSM

In this iteration we worked out four steps to monitor the WSM data quality and coverage.

  • Identified WSM KPIs
  • Defined measurement points
  • Prioritized KPIs
  • Roadmap KPIs

The first step focus on identification of the KPIs to be measured.

C34 Monitor WPM

C19 Train Operation

C77 Consignment Note in WDI