Difference between revisions of "Phase3 Iteration7"

From RFF Wiki
Jump to: navigation, search
Line 23: Line 23:
  
 
In the meantime the SteerCo has validated the proposed RFF organisation setup.
 
In the meantime the SteerCo has validated the proposed RFF organisation setup.
 +
 +
= Planning 2022 =
 +
* June/July:
 +
** Business Workshops
 +
** Workpackage leader introduction
 +
* August:
 +
** Technical Workshops
 +
** Workpackage leader introduction
 +
* September:
 +
** Finalization of Dossiers
 +
* After September:
 +
** KickOff of the Workpackages

Revision as of 13:26, 21 June 2022

Iteration 21.6

The iteration lasts from 21.June to 12.July.

Topics

  • MARS status and demo
  • WP workshops status
  • WP leader introductions
  • Planning 2022

DP Rail topics

In DP Rail the following topics are treated:

  1. Digital Train Operations Initial Workshop on 8.June √
  2. Digital Train Handover Initial Workshop on 9.June √
  3. Digital Consignment Note Initial Workshop on 5.July [planned]
  4. Digital Train Composition Initial Workshop on 30.June [planned]
  5. Telematic Data Sharing Initial Workshop on 13.June √
  6. Train Service Harmonization Initial Workshop on 14.June √
  7. Train ETA Service Initial Workshop on 27.June [planned]

The DP Rail organisation is laid out here: File:DP-RAIL-Contribution RFF IT Fullteam Folien 0-19.pdf

In the meantime the SteerCo has validated the proposed RFF organisation setup.

Planning 2022

  • June/July:
    • Business Workshops
    • Workpackage leader introduction
  • August:
    • Technical Workshops
    • Workpackage leader introduction
  • September:
    • Finalization of Dossiers
  • After September:
    • KickOff of the Workpackages