Difference between revisions of "Phase2 Iteration5"

From RFF Wiki
Jump to: navigation, search
(C14: Define report tool for RFF)
(Topics)
Line 15: Line 15:
 
The target is to define the centrally operated reporting tool for the RFF digital platform.
 
The target is to define the centrally operated reporting tool for the RFF digital platform.
  
And three existing to continue:
+
And two existing to continue:
  
 
===== C01: Managed CRD Location Masterdata =====
 
===== C01: Managed CRD Location Masterdata =====

Revision as of 15:57, 13 April 2021

The Phase 2 works in iterations. See setup of the Architecture stream.

Iteration 5

The fifth iteration lasts from 25.March to 15.April.

Topics

Capabilities

There are two new topics to handle:

C43: Office Integration of RSDS requests

The task foresees to lower the hurdles for A type RUs to access RollingStock datasets. This should be achieved by utilizing Office technology.

C14: Define report tool for RFF

The target is to define the centrally operated reporting tool for the RFF digital platform.

And two existing to continue:

C01: Managed CRD Location Masterdata

The target of this task is to enhance the CRD masterdata to a level where it can be used as new GEO masterdata reference. We will start this task in this iteration by

  • collect the experience and gaps with the CRD data quality so far
  • sketch a analysis method to determine the actual state of the master data
  • evaluate whether a data quality assurance is needed (CRD KPI)
  • defining the maintenance process

We know that this task will accompany us for several iterations.

SM: SmartService Profile

Based on the Smart Services list we continue to describe the Smart Services. With these profiles we can then start the discussion with the CIO/steering committee on prioritization.


Reviews

Smart Service profiles


Results