Difference between revisions of "End-To-End Transport Planning"
From RFF Wiki
(Created page with " == Description == Standardized hand-over information, standardize first + last mile (infrastructure, siding information, locations) == Use Case == == Preconditions ==...") |
|||
Line 2: | Line 2: | ||
== Description == | == Description == | ||
− | Standardized hand-over information, standardize first + last mile (infrastructure, siding information, locations) | + | Standardized hand-over information for all transportation modes (SWL; block trains etc), standardize first + last mile (infrastructure, siding information, locations) |
== Use Case == | == Use Case == |
Revision as of 10:04, 20 May 2021
Contents
Description
Standardized hand-over information for all transportation modes (SWL; block trains etc), standardize first + last mile (infrastructure, siding information, locations)