Difference between revisions of "Phase3 Iteration7"

From RFF Wiki
Jump to: navigation, search
(Created page with "= Iteration 21.6 = The iteration lasts from 10.May to 31.May. = Topics = * MARS status and demo * WP workshops status * WP leader introductions * Planning 2022 = DP Rail t...")
 
Line 1: Line 1:
 
= Iteration 21.6 =
 
= Iteration 21.6 =
The iteration lasts from 10.May to 31.May.
+
The iteration lasts from 21.June to 12.July.
  
 
= Topics =
 
= Topics =

Revision as of 13:10, 16 June 2022

Iteration 21.6

The iteration lasts from 21.June to 12.July.

Topics

  • MARS status and demo
  • WP workshops status
  • WP leader introductions
  • Planning 2022

DP Rail topics

In DP Rail the following topics are treated.

  1. Train Service Harmonization
  2. Digital Consignment Note
  3. Digital Train Composition
  4. Telematic Data Sharing
  5. Digital Train Operations
  6. Train ETA Service
  7. Digital Train Handover

The DP Rail organisation is laid out here: File:DP-RAIL-Contribution RFF IT Fullteam Folien 0-19.pdf

In the meantime the SteerCo has validated the proposed RFF organisation setup.