Difference between revisions of "Phase2 Iteration12"

From RFF Wiki
Jump to: navigation, search
(Created page with "The Phase 2 works in iterations. See setup of the Architecture stream. == Iteration 11 == The twelve iteration lasts from 4.November to 25.November. === Topics === ==== Cap...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
The Phase 2 works in iterations. See setup of the Architecture stream.
 
The Phase 2 works in iterations. See setup of the Architecture stream.
  
== Iteration 11 ==
+
== Iteration 12 ==
The twelve iteration lasts from 4.November to 25.November.
+
The twelve iteration lasts from 25.November to 16.December.
  
 
=== Topics ===
 
=== Topics ===
Line 34: Line 34:
  
 
==== WalkIn session ====
 
==== WalkIn session ====
ERA RCC presentation on the 16th of November.
+
Next WalkIn meeting will be on Tuesday 18.January 2022.
  
 
----
 
----
Line 43: Line 43:
 
----
 
----
 
=== Results ===
 
=== Results ===
 +
The POC with MS will end with phase two "Scoping".

Latest revision as of 15:25, 13 January 2022

The Phase 2 works in iterations. See setup of the Architecture stream.

Iteration 12

The twelve iteration lasts from 25.November to 16.December.

Topics

Capabilities

C01: Managed CRD Location Masterdata

The target of this task is to enhance the CRD master data to a level where it can be used as new GEO master data reference. We will continue this task by

  • collect the experience and gaps with the CRD data quality so far
  • sketch a analysis method to determine the actual state of the master data
  • evaluate whether a data quality assurance is needed (CRD KPI)
  • defining the maintenance process
  • Bilateral location quality meetings will be planned to discuss the national specialties and the maintenance process.
  • Beside that we will continue on the GEO model – location link.

User Validation

  1. Alignment with A&B type partners

The next alignment session with A&B type partners is planned for 30.November.

POC DigitalPlatform

Lead the architecture work in the POC with MS.

  • setup the data model
  • define the message flows

for the three POC topics.

POC MARS MVP

Work on the publication of the MARS functionality and sprints.​

  • contribute to the MARS architecture.
  • support MARS project team in defining use case 1 "Login".

WalkIn session

Next WalkIn meeting will be on Tuesday 18.January 2022.


Reviews


Results

The POC with MS will end with phase two "Scoping".