Difference between revisions of "Phase2 Iteration12"
From RFF Wiki
(Created page with "The Phase 2 works in iterations. See setup of the Architecture stream. == Iteration 11 == The twelve iteration lasts from 4.November to 25.November. === Topics === ==== Cap...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
The Phase 2 works in iterations. See setup of the Architecture stream. | The Phase 2 works in iterations. See setup of the Architecture stream. | ||
− | == Iteration | + | == Iteration 12 == |
− | The twelve iteration lasts from | + | The twelve iteration lasts from 25.November to 16.December. |
=== Topics === | === Topics === | ||
Line 34: | Line 34: | ||
==== WalkIn session ==== | ==== WalkIn session ==== | ||
− | + | Next WalkIn meeting will be on Tuesday 18.January 2022. | |
---- | ---- | ||
Line 43: | Line 43: | ||
---- | ---- | ||
=== Results === | === Results === | ||
+ | The POC with MS will end with phase two "Scoping". |
Latest revision as of 15:25, 13 January 2022
The Phase 2 works in iterations. See setup of the Architecture stream.
Contents
Iteration 12
The twelve iteration lasts from 25.November to 16.December.
Topics
Capabilities
C01: Managed CRD Location Masterdata
The target of this task is to enhance the CRD master data to a level where it can be used as new GEO master data reference. We will continue this task by
- collect the experience and gaps with the CRD data quality so far
- sketch a analysis method to determine the actual state of the master data
- evaluate whether a data quality assurance is needed (CRD KPI)
- defining the maintenance process
- Bilateral location quality meetings will be planned to discuss the national specialties and the maintenance process.
- Beside that we will continue on the GEO model – location link.
User Validation
- Alignment with A&B type partners
The next alignment session with A&B type partners is planned for 30.November.
POC DigitalPlatform
Lead the architecture work in the POC with MS.
- setup the data model
- define the message flows
for the three POC topics.
POC MARS MVP
Work on the publication of the MARS functionality and sprints.
- contribute to the MARS architecture.
- support MARS project team in defining use case 1 "Login".
WalkIn session
Next WalkIn meeting will be on Tuesday 18.January 2022.
Reviews
Results
The POC with MS will end with phase two "Scoping".