Difference between revisions of "End-To-End Path Planning/Ordering"
From RFF Wiki
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
* Enabler of Long Term Timetables & Time Table Redesign (TTR) | * Enabler of Long Term Timetables & Time Table Redesign (TTR) | ||
* More capacity with same infrastructure | * More capacity with same infrastructure | ||
+ | |||
+ | [[File:RFF_DCM_railways.png|border|600px]]] | ||
== Use Case == | == Use Case == | ||
Line 39: | Line 41: | ||
* Phased build-up to full European Digitally Connected Rail System | * Phased build-up to full European Digitally Connected Rail System | ||
+ | [[File:RFF_DCM_planning.png|border|600px]]] | ||
== Evaluation == | == Evaluation == |
Latest revision as of 14:21, 26 August 2021
Contents
Description
- High quality rail path booking to support modal shift
- Avoid conflicts between passenger & freight
- Better alignment of rail paths with infrastructure works
- Optimizes RU / IM resources and way of working
- Enabler of Long Term Timetables & Time Table Redesign (TTR)
- More capacity with same infrastructure
Use Case
DCM is the capability of IMs to meet customer demands on ...
- easy access
- to good quality capacity on rail infrastuture
- in all parts of the planning process
- for domestic and international transport across Europe
- allowing RUs and IMs for optimisation of ressources
... by means of...
- Digitalisation
- Automatisation • Optimisation
...for the full capacity managagement planning process
Preconditions
Basic Services
- Digitalize the representation of infrastructure
- create automated construction
- create optimization with algorithms for single day and longer periods,
- create automated allocation,
- create interface with booking frontends to have one access for all
- create international harmonization/international optimization
Dependencies
Planned Steps
- Core group of IM’s to take the lead (DB Netz, Infrabel, Prorail, SNCF Réseau, SBB Infra and ÖBB Infra)
- Coordination by RNE incl. a dedicated working group and RU’s for ‘customer view’
- Funding by Green Deal and on national level
- Phased build-up to full European Digitally Connected Rail System