Difference between revisions of "End-To-End Path Planning/Ordering"

From RFF Wiki
Jump to: navigation, search
Line 8: Line 8:
 
* Enabler of Long Term Timetables & Time Table Redesign (TTR)
 
* Enabler of Long Term Timetables & Time Table Redesign (TTR)
 
* More capacity with same infrastructure
 
* More capacity with same infrastructure
 +
 +
[[File:RFF_DCM_railways.png]]
  
 
== Use Case ==
 
== Use Case ==
Line 39: Line 41:
 
* Phased build-up to full European Digitally Connected Rail System
 
* Phased build-up to full European Digitally Connected Rail System
  
 +
[[File:RFF_DCM_planning.png]]
 
== Evaluation ==
 
== Evaluation ==

Revision as of 14:16, 26 August 2021

Description

  • High quality rail path booking to support modal shift
  • Avoid conflicts between passenger & freight
  • Better alignment of rail paths with infrastructure works
  • Optimizes RU / IM resources and way of working
  • Enabler of Long Term Timetables & Time Table Redesign (TTR)
  • More capacity with same infrastructure

RFF DCM railways.png

Use Case

DCM is the capability of IMs to meet customer demands on ...

  • easy access
  • to good quality capacity on rail infrastuture
  • in all parts of the planning process
  • for domestic and international transport across Europe
  • allowing RUs and IMs for optimisation of ressources

... by means of...

  • Digitalisation
  • Automatisation • Optimisation

...for the full capacity managagement planning process

Preconditions

Train Harmonization Service

Basic Services

  • Digitalize the representation of infrastructure
  • create automated construction
  • create optimization with algorithms for single day and longer periods,
  • create automated allocation,
  • create interface with booking frontends to have one access for all
  • create international harmonization/international optimization

Dependencies

Planned Steps

  • Core group of IM’s to take the lead (DB Netz, Infrabel, Prorail, SNCF Réseau, SBB Infra and ÖBB Infra)
  • Coordination by RNE incl. a dedicated working group and RU’s for ‘customer view’
  • Funding by Green Deal and on national level
  • Phased build-up to full European Digitally Connected Rail System

RFF DCM planning.png

Evaluation