Revision history of "Phase2 Iteration7"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 08:32, 16 June 2021Sfr (talk | contribs). . (1,419 bytes) (+148). . (Smart Service profiles)
  • (cur | prev) 09:39, 15 June 2021Sfr (talk | contribs). . (1,271 bytes) (+1,271). . (Created page with "The Phase 2 works in iterations. See setup of the Architecture stream. == Iteration 7 == The sept iteration lasts from 27.May to 15.June. === Topics === ==== Capabilities =...")